This photo of Joie and early housemate Rob standing atop a mountain of trash was taken 3 years ago, following the first cleanup efforts at Chateau de Joie.

It was hard to believe that one house could have any more trash to discard...until the problems hidden behind the walls and floor coverings began making themselves known via leaks and mysterious odors.

For the first time since Joie & Marilyn have been in residence, the downstairs apartment was to be completely empty for a few weeks, so it was decided to replace the old carpeting, bathroom fixtures and cabinetry and, hopefully, figure out what smelled so bad. So they did some shopping and ordering, lined up their favorite contractors for the work they couldn't (like plumbing and electrical) or didn't have time to do (like laying 800+ sq,ft. of plank flooring) and had our second dumpster delivered.


Sweetie is NOT amused.



In their delusional optimism, they opted for a smaller one than the first. A month into demolition, they realized their mistake but there was no way to swap it out.
The giant tetris game is going to have to be in play once again.
Wondering if we'll EVER get rid of those dang poles!



So, where did all that trash come from? It turned out that beneath all the old carpeting was very thick, rubbery padding (which answered a piece of the smell question) and beneath that were a gazillion tiles, all of which had to be removed before planking, appropriate padding for a concrete floor and new carpeting could be installed.

And then there were all the bathroom and kitchen cabinets and fixtures which had been concealing rotten drywall and behind the drywall was questionably filthy, pink fiberglass insulation, broken pipes (like the one at right) and rotten wood... (sigh). At least, there was no longer a question of where the unpleasant odor originated from. Joie and Marilyn had no choice but to gut a great portion of the apartment down to the studs.

Katherine vs nails in concrete

As you can see from the pic at left, Marilyn seemed to think demolition could be done without making too much of a mess.



 
Luckily, former housemate Katherine and colleague Adeline volunteered to help crash the bathroom that had the worst problems. Both ladies only asked that they be allowed to use the crowbar and slam the sledge hammer against something that dared to resist. Cussing out loud was a secondary request. Both requests were happily granted!







Adeline vs cast iron tub
Katherine & Joie in full battle gear

The cast iron tub turned out to have more resistance than any of the ladies imagined possible. Our Main Man, Contractor/Magician Ryan Regan-Ladd had to take over the sledge hammer to get the job done.

Obviously, the idea of updating the entire apartment within a couple weeks was as delusional as our choice of dumpster size. In the posts following this one, you'll see how Marilyn, Joie and a wonderful crew of subcontractors raced against the clock to get everything ready for the next round of graduate student housemates.